Last modified:: Oct 11, 2025

Polestar 3 Long Range Dual Motor charging curve & performance ( MY2025 )

Below is the charging curve for Polestar 3 Long Range Dual Motor, illustrating the charging speed at various battery levels. Additionally, graphs for range and time provide comprehensive details on charging performance.

111.0 kWh — 111 kWh

Spec Value
Average charging speed 0 - 100% 103.9 kW
Average charging speed 10-100% 98.3 kW
Average charging speed 10-90% 116.7 kW
Average charging speed 10-80% 131.7 kW
Max C-Rate 2.28
Average C-Rate 1.26
Optimum charging area 0% – 39%
Optimum charging speed included 5 minutes loss 128.5 kW
Optimum charge stop time 19m 28s
Spec Value
Charging time 0 - 100% 1 h 1 m 47 s
Charging time 10-100% 58 m 46 s
Charging time 10-80% 34 m 7 s
EPA cycle WLTP cycle 70 mph 120 km/h
Range per minute 0-100% 8.2 km (5.1 mi) 10.2 km (6.3 mi) 7.5 km (4.7 mi) 7.2 km (4.5 mi)
Range per minute 10-100% 7.8 km (4.8 mi) 9.7 km (6.0 mi) 7.1 km (4.4 mi) 6.8 km (4.2 mi)
Range per minute 10-80% 10.4 km (6.5 mi) 12.9 km (8.0 mi) 9.5 km (5.9 mi) 9.1 km (5.7 mi)

Charging Data

SOC Speed Time Energy charged