Aion Hyper GT 710 Supercharged charging curve & performance

Last modified: Nov 22, 2025

Below is the charging curve for Aion Hyper GT 710 Supercharged, illustrating the charging speed at various battery levels. Additionally, graphs for range and time provide comprehensive details on charging performance.

Charging Highlights

Peak DC Speed
200 kW
Battery Capacity
80.1 kWh

80.1 kWh —

Estimated Data

The charging curve for this model is derived from manufacturer data and insights into the charging performance of similar battery packs.

Charging Performance

Average 0-100% 108.7 kW
Average 10-100% 107.4 kW
Average 10-80% 136.4 kW

Advanced Metrics

Max C-Rating 2.50C
Avg C-Rating 1.71C
Optimum Zone 3% – 59%

Time Analysis

Range Analysis

Key Insights

Optimum Speed
123.5 kW
Optimum Time
20m 57s
10-80% Time
23 m 42 s

Charging Speed Analysis

SOC Range Avg Speed (kW) Total Time Energy Added
0-100% 108.7 kW 42 m 29 s 77.0 kWh
10-100% 107.4 kW 38 m 43 s 69.3 kWh
10-80% ⭐ 136.4 kW 23 m 42 s 53.9 kWh

Range Added Per Minute by Driving Cycle

SOC Range EPA WLTP 70 mph 120 km/h
0-100% ? ? 9.5 km (5.9 mi) 9.1 km (5.7 mi)
10-100% ? ? 9.4 km (5.8 mi) 8.9 km (5.5 mi)
10-80% ⭐ ? ? 12.0 km (7.5 mi) 11.4 km (7.1 mi)

Complete Charging Curve Data (0–100% SOC)

SOC Speed Time Energy charged

Master Your EV Charging Strategy

Understanding charging curves helps you plan efficient road trips and optimize your daily charging routine.

Peak Performance

Charge faster in the 10-80% range for optimal speed

Time Efficiency

Plan stops around optimum charging zones

Temperature Matters

Battery temperature affects charging speed significantly