pt-BR evkx.views.lastmodified nov. 22, 2025

pt-BR page.charging.title ( MY2025, MY2026 )

pt-BR drivetrain.charging.chargingcurveintro

63,0 kWh — 63 kWh

pt-BR Table.Header.Specification pt-BR Table.Header.Value
pt-BR charging.average0100 76,5 kW
pt-BR charging.average10100 72,9 kW
pt-BR charging.average1090 85,8 kW
pt-BR charging.average1080 95,1 kW
pt-BR charging.maxcrating 2,68
pt-BR charging.averagecrating 1,64
pt-BR charging.optimumarea 1% – 45%
pt-BR charging.optimumspeed 93,6 kW
pt-BR charging.optimumtime 16m 38s
pt-BR Table.Header.Specification pt-BR Table.Header.Value
pt-BR charging.time0100 46 m 16 s
pt-BR charging.time10100 43 m 41 s
pt-BR charging.time1080 26 m 3 s
EPA cycle WLTP cycle 70 mph 120 km/h
pt-BR charging.rangeperminute0100 ? 8,4 km (5,2 mi) 6,9 km (4,3 mi) 6,5 km (4,0 mi)
pt-BR charging.rangeperminute10100 ? 8,0 km (5,0 mi) 6,6 km (4,1 mi) 6,2 km (3,9 mi)
pt-BR charging.rangeperminute1080 ? 10,5 km (6,5 mi) 8,6 km (5,3 mi) 8,1 km (5,0 mi)

pt-BR charging.table.title

pt-BR charging.table.soc pt-BR charging.table.speed pt-BR charging.table.time pt-BR charging.table.energy