pt-BR evkx.views.lastmodified dez. 07, 2025

pt-BR page.charging.title ( MY2025 )

pt-BR drivetrain.charging.chargingcurveintro

80,8 kWh — 80.8kWh LFP

pt-BR charging.estimated
pt-BR Table.Header.Specification pt-BR Table.Header.Value
pt-BR charging.average0100 121,7 kW
pt-BR charging.average10100 122,8 kW
pt-BR charging.average1090 179,8 kW
pt-BR charging.average1080 220,0 kW
pt-BR charging.maxcrating 5,26
pt-BR charging.averagecrating 2,74
pt-BR charging.optimumarea 7% – 61%
pt-BR charging.optimumspeed 182,7 kW
pt-BR charging.optimumtime 14m 11s
pt-BR Table.Header.Specification pt-BR Table.Header.Value
pt-BR charging.time0100 39 m 27 s
pt-BR charging.time10100 35 m 10 s
pt-BR charging.time1080 15 m 16 s
EPA cycle WLTP cycle 70 mph 120 km/h
pt-BR charging.rangeperminute0100 ? 12,9 km (8,0 mi) 9,7 km (6,0 mi) 8,8 km (5,5 mi)
pt-BR charging.rangeperminute10100 ? 13,0 km (8,1 mi) 9,7 km (6,0 mi) 8,9 km (5,5 mi)
pt-BR charging.rangeperminute1080 ? 23,4 km (14,5 mi) 17,5 km (10,9 mi) 15,9 km (9,9 mi)

pt-BR charging.table.title

pt-BR charging.table.soc pt-BR charging.table.speed pt-BR charging.table.time pt-BR charging.table.energy