pt-BR evkx.views.lastmodified dez. 21, 2025

pt-BR page.charging.title ( MY2026 )

pt-BR drivetrain.charging.chargingcurveintro

61,1 kWh — 61.1 kWh

pt-BR charging.estimated
pt-BR Table.Header.Specification pt-BR Table.Header.Value
pt-BR charging.average0100 27,2 kW
pt-BR charging.average10100 26,9 kW
pt-BR charging.average1090 49,0 kW
pt-BR charging.average1080 57,5 kW
pt-BR charging.maxcrating 1,15
pt-BR charging.averagecrating 0,87
pt-BR charging.optimumarea 4% – 65%
pt-BR charging.optimumspeed 55,3 kW
pt-BR charging.optimumtime 39m 33s
pt-BR Table.Header.Specification pt-BR Table.Header.Value
pt-BR charging.time0100 2 h 11 m 48 s
pt-BR charging.time10100 1 h 59 m 54 s
pt-BR charging.time1080 43 m 39 s
EPA cycle WLTP cycle 70 mph 120 km/h
pt-BR charging.rangeperminute0100 ? 3,0 km (1,9 mi) 2,2 km (1,4 mi) 2,1 km (1,3 mi)
pt-BR charging.rangeperminute10100 ? 3,0 km (1,9 mi) 2,1 km (1,3 mi) 2,0 km (1,2 mi)
pt-BR charging.rangeperminute1080 ? 6,3 km (3,9 mi) 4,6 km (2,9 mi) 4,4 km (2,7 mi)

pt-BR charging.table.title

pt-BR charging.table.soc pt-BR charging.table.speed pt-BR charging.table.time pt-BR charging.table.energy