Geely Xingyuan 410 charging curve & performance

2025, 2026
Last modified: Mar 25, 2026

Below is the charging curve for Geely Xingyuan 410, illustrating the charging speed at various battery levels. Additionally, graphs for range and time provide comprehensive details on charging performance.

Charging Highlights

Peak DC Speed
67 kW
Battery Capacity
40.2 kWh

40.2 kWh —

Charging Performance

Average charging speed 0 - 100% 0 kW
Average charging speed 10-100% 0 kW
Average charging speed 10-80% 0 kW

Advanced Metrics

Max C-Rate 1.67C
Average C-Rate 1.23C
Optimum charging area 0% – 100%

Time Analysis

Range Analysis

Key Insights

Optimum charging speed included 5 minutes loss
0 kW
Optimum charge stop time
0m 0s
Charging time 10-80%
0 m 0 s

Charging Speed Analysis

SOC Range Speed (kW) Total Time Energy Added
0-100% 0 kW 0 m 0 s 0 kWh
10-100% 0 kW 0 m 0 s 0 kWh
10-80% 0 kW 0 m 0 s 0 kWh

Range Added Per Minute by Driving Cycle

SOC Range EPA WLTP 70 mph 120 km/h
0-100% ? ? ? ?
10-100% ? ? ? ?
10-80% ? ? ? ?

Charging Curve Data (0–100% SOC)

SOC Speed Time Energy charged