|
Charging Comparison
Combined charging curves, time analysis and range comparison
|
||
|---|---|---|
| Charging Curve |
|
|
| Time Analysis |
|
|
| Range Analysis |
|
|
| Charging Data | BYD ATTO 1 Essential 2026 | BYD ATTO 1 Premium 2026 |
| Max DC Charge Speed | 65 kW | 85 kW |
| Charge Time 0-100% | 1 h 48 m 42 s | 2 h 26 m 30 s |
| Average Speed 0-100% | 16.6 kW | 17.7 kW |
| Charge Time 10-80% | 23 m 15 s | 30 m 9 s |
| Average Speed 10-80% | 54.2 kW | 60.1 kW |
| Charge Time 10-100% | 1 h 45 m 43 s | 2 h 23 m 13 s |
| Average Speed 10-100% | 15.3 kW | 16.3 kW |
| Energy in 10 min (from 10%) | 8.2 kWh | 10.6 kWh |
| Energy in 30 min (from 10%) | 22.0 kWh | 29.0 kWh |
| Max C-Rating | 2.03C | 1.85C |