|
Charging Comparison
Combined charging curves, time analysis and range comparison
|
||
|---|---|---|
| Charging Curve |
|
|
| Time Analysis |
|
|
| Range Analysis |
|
|
| Charging Data | Mercedes EQS 580 4MATIC MY2024 MY2025 | Nio ET9 |
| Max DC Charge Speed | 210 kW | 600 kW |
| Charge Time 0-100% | 1 h 31 m 12 s | 32 m 0 s |
| Average Speed 0-100% | 77.6 kW | 209.9 kW |
| Charge Time 10-80% | 33 m 8 s | 14 m 29 s |
| Average Speed 10-80% | 149.5 kW | 324.5 kW |
| Charge Time 10-100% | 1 h 26 m 55 s | 28 m 58 s |
| Average Speed 10-100% | 73.3 kW | 208.7 kW |
| Energy in 10 min (from 10%) | 24.3 kWh | 53.9 kWh |
| Energy in 30 min (from 10%) | 72.8 kWh | 100.8 kWh |
| Max C-Rating | 1.66C | 5C |