|
Charging Comparison
Combined charging curves, time analysis and range comparison
|
||||
|---|---|---|---|---|
| Charging Curve |
|
|||
| Time Analysis |
|
|||
| Range Analysis |
|
|||
| Charging Data | Chevrolet Silverado EV 3WT 2024 2025 | Ford F150 Lightning Extended Range | Chevrolet Silverado EV SRT | Rivian R1T Performance Dual-Motor AWD MP |
| Max DC Charge Speed | 350 kW | 155 kW | 350 kW | 207 kW |
| Charge Time 0-100% | 2 h 6 m 12 s | 2 h 11 m 42 s | 1 h 24 m 33 s | 2 h 11 m 18 s |
| Average Speed 0-100% | 90.3 kW | 59.2 kW | 152.5 kW | 65.3 kW |
| Charge Time 10-80% | 43 m 56 s | 49 m 48 s | 34 m 43 s | 47 m 22 s |
| Average Speed 10-80% | 181.6 kW | 109.6 kW | 260.1 kW | 126.8 kW |
| Charge Time 10-100% | 2 h 2 m 28 s | 2 h 6 m 6 s | 1 h 20 m 29 s | 2 h 6 m 40 s |
| Average Speed 10-100% | 83.8 kW | 55.7 kW | 144.2 kW | 61.0 kW |
| Energy in 10 min (from 10%) | 40.5 kWh | 17.5 kWh | 46.5 kWh | 23.3 kWh |
| Energy in 30 min (from 10%) | 115.3 kWh | 53.2 kWh | 127.7 kWh | 69.1 kWh |
| Max C-Rating | 1.72C | 1.07C | 1.61C | 1.39C |