|
Charging Comparison
Combined charging curves, time analysis and range comparison
|
||
|---|---|---|
| Charging Curve |
|
|
| Time Analysis |
|
|
| Range Analysis |
|
|
| Charging Data | BYD ATTO 3 EVO RWD MY2026 | Geely EX5 MY2025 |
| Max DC Charge Speed | 220 kW | 100 kW |
| Charge Time 0-100% | 52 m 4 s | 1 h 8 m 23 s |
| Average Speed 0-100% | 86.2 kW | 52.8 kW |
| Charge Time 10-80% | 23 m 30 s | 30 m 1 s |
| Average Speed 10-80% | 133.6 kW | 84.2 kW |
| Charge Time 10-100% | 46 m 43 s | 1 h 4 m 27 s |
| Average Speed 10-100% | 86.4 kW | 50.4 kW |
| Energy in 10 min (from 10%) | 23.3 kWh | 14.1 kWh |
| Energy in 30 min (from 10%) | 57.7 kWh | 40.3 kWh |
| Max C-Rating | 2.89C | 1.94C |