|
Charging Comparison
Combined charging curves, time analysis and range comparison
|
||
|---|---|---|
| Charging Curve |
|
|
| Time Analysis |
|
|
| Range Analysis |
|
|
| Charging Data | Leapmotor B05 56.2 kWh 2026 | Leapmotor B05 67.1 kWh 2026 |
| Max DC Charge Speed | 156 kW | 174 kW |
| Charge Time 0-100% | 1 h 41 m 44 s | 1 h 57 m 31 s |
| Average Speed 0-100% | 32.4 kW | 33.2 kW |
| Charge Time 10-80% | 25 m 58 s | 29 m 19 s |
| Average Speed 10-80% | 88.9 kW | 93.1 kW |
| Charge Time 10-100% | 1 h 36 m 26 s | 1 h 51 m 41 s |
| Average Speed 10-100% | 30.8 kW | 31.4 kW |
| Energy in 10 min (from 10%) | 18.1 kWh | 19.5 kWh |
| Energy in 30 min (from 10%) | 39.2 kWh | 44.2 kWh |
| Max C-Rating | 2.78C | 2.59C |