|
Charging Comparison
Combined charging curves, time analysis and range comparison
|
||
|---|---|---|
| Charging Curve |
|
|
| Time Analysis |
|
|
| Range Analysis |
|
|
| Charging Data | Tesla Model Y Long Range MY2025 | Mercedes EQE 53 4MATIC+ SUV |
| Max DC Charge Speed | 250 kW | 170 kW |
| Charge Time 0-100% | 1 h 11 m 28 s | 1 h 2 m 20 s |
| Average Speed 0-100% | 66.3 kW | 87.2 kW |
| Charge Time 10-80% | 34 m 27 s | 29 m 24 s |
| Average Speed 10-80% | 96.3 kW | 129.4 kW |
| Charge Time 10-100% | 1 h 7 m 54 s | 58 m 42 s |
| Average Speed 10-100% | 62.8 kW | 83.3 kW |
| Energy in 10 min (from 10%) | 22.5 kWh | 20.6 kWh |
| Energy in 30 min (from 10%) | 50.1 kWh | 61.8 kWh |
| Max C-Rating | 2.99C | 1.75C |